With Phase 1 and Phase 2 combined, the total length of the entire line is about how many km?
Answer and explanation
Correct answer: C. 688 km
- Step 1: With Phase 1 and Phase 2 combined, the total length of the entire line is about 688 km and the construction cost amounting to RM55 billion. Answer: 688 km. Why not the others: 488 km, 888 km and 600.3 km don't fit.
Practise more Malaysian Culture, Economy and Society.
Free questions with an explanation for every one, and full timed General Knowledge (Malaysia) mock tests.
More Malaysian Culture, Economy and Society questions
- Which index ranked Kuala Lumpur the 6th most-visited city in the world in 2019?
- In which year was the city centre of George Town designated a UNESCO World Heritage Site?
- Which mountain, east of Kota Kinabalu, gave the city its name?
- Historically, the Kadazandusuns called the area by what name?
- A Hindu temple dedicated to lord Murugan was completed in which year?
- At Batu Caves, in which year were wooden steps installed to enable pilgrims to reach the temple?