Complete the sentence about 1934 Nepal–India earthquake with the correct year: The ______-meter-long Kosi Rail Bridge on the Metre Gauge Railway line connecting Darbhanga Raj with Forbesganj was washed away and the River Kosi changed its path eastward.

Answer and explanation

Correct answer: D. 1618

The 1618-metre-long Kosi Rail Bridge on the metre gauge line was one of the structures that stood.

Practise more History And Politics.

Free questions with an explanation for every one, and full timed General Knowledge (Nepal) mock tests.