In Serbian road signage and signals, what does a rectangular sign displaying the name of a town (e.g. 'BEOGRAD') on a white/yellow background mean?

Answer and explanation

Correct answer: C. Beginning of built-up area (50 km/h speed limit)

  1. Step 1: Sign III-21 marks entry into a built-up area where urban traffic rules and the 50 km/h limit take effect. Answer: Beginning of built-up area (50 km/h speed limit). Why not the others: the alternative options do not represent statutory provisions under Serbian road signage and signalling regulations.