Why was the Pelješac Bridge, opened in 2022, built?

Answer and explanation

Correct answer: A. To link the two parts of the Croatian coast that are separated by the short coast of Bosnia and Herzegovina at Neum

  1. Step 1: A short stretch of Bosnian coast at Neum divides southern Dalmatia from the rest of Croatia. Step 2. The bridge lets traffic cross to Pelješac and the south without passing through that territory. Answer: To link the two parts of Croatian coast. Why not the others: The others do not describe the bridge.

Practise more Croatian Geography and Nature.

Free questions with an explanation for every one, and full timed Croatian General Knowledge mock tests.