Where should a lanyard be clipped when you work in the basket of a boom-type MEWP?

Answer and explanation

Correct answer: C. To the designated anchor point, on a short lanyard

  1. Step 1: Anchor points are designed to take the loads. Step 2. A rail is not designed as an anchor and could fail. Answer: To the designated anchor point, on a short lanyard. Why not the others: Rails, trees and doing nothing give no secure anchor.